|
| Even the heavy ones break down! |

|
| But we can recover |
| same 93 ton genarator at tilbury docks |

|
| for shipment to america |
| part of batching plant at 31 tons from germany |

|
| to london |
| another view of tusk girder |

|
| for heathrow |
| part of a liebherr crane from liebherr works |

|
| to sunderland docks for shippment abroad |
| same sort of load boiler tubes from utrecht |

|
| load on johnsons latest trailer extends to 30 metres |
|
 |
|
| Getting ready for the start |

|
| 93 ton generator middlesbrough to tilbury docks |

|
| escorted by colin in his escort van |
| 58 ton reel of wire bromborough to dunkerque |

|
| for shippment to libia |
| tusk girder from our yard to heathrow |

|
| for terminal five |
| reversing 78 ton load round to docks |

|
| in arklow southern ireland |
| boiler tube for power station at wilton teeside |

|
| load not heavy 4.50 wide from utrecht holland |
| colleted from munchen show out rigger assembly |

|
| for welldex cranes england load 42 ton |
|
|
 |
|
| Return load from Holland |

|
| Silo for London |
| crane from amsterdam docks to ipswich |

|
| 32 ton |
| 75 ton crane from barnsley |

|
| to tilbury docks shippment to africa |
| this is a part of a vessel from an old works on |

|
| way to docks 78 ton on 1o axle trailer , |
| part of foot bridge to cross railway in cambridge |

|
| load 27 metre long 42 ton from sunderland |
| another load of boiler pipes from utrecht |

|
| but on different trailer |
|
 |
|
|
|